Frequently asked question

sub-iconFAQ’s

Frequently asked question

1. Environmental Clearance (EC)

Environmental Clearance is a statutory approval required before starting certain projects to assess environmental impact and ensure mitigation measures are in place.
Mining projects, building & construction projects, waste management facilities, CETPs, and other notified sectors require EC as per EIA Notification.
Category A projects are appraised at central level (MoEF&CC), while Category B projects are appraised at state level (SEIAA).
Yes. We are QCI–NABET accredited (Category B) for preparation of EIA/EMP reports in approved sectors.
Project details, land documents, baseline data, conceptual plan, mining plan (if applicable), and other statutory details.
Yes. We conduct air, water, soil, noise and ecological baseline monitoring as required.
EMP (Environmental Management Plan) outlines mitigation measures, monitoring plans, and environmental safeguards.
Timelines depend on project type and regulatory process, generally ranging from 4 to 8 months.
Yes. We support documentation, presentation, and compliance requirements during public consultation
Yes. We prepare half-yearly compliance reports and assist in ongoing regulatory submissions.

2. CTE / CTO (Pollution Control)

CTE is approval required before setting up an industrial or commercial project.
CTO is approval required before commencing operations after installation.
Yes, for industries categorized under pollution control norms.
Yes. We handle complete online application filing and documentation.
Project report, layout plan, pollution control measures, water balance, and environmental management details.
Yes. We handle renewals and compliance updates.
Industries are classified based on pollution potential.
Yes. We coordinate and prepare compliance documents.
Yes. We prepare periodic compliance documentation.
Yes, subject to regulatory framework of respective states.

MINING & REGULATORY SERVICES

Yes. We prepare mining plans as per statutory guidelines.
Geology, production planning, environmental safeguards, safety measures, and closure plan.
Yes. We provide documentation and procedural support.
DGMS compliance relates to safety regulations in mining operations.
Yes. We conduct vibration monitoring during blasting operations.
It ensures structural safety and regulatory compliance.
Yes. We provide accurate DGPS mapping and boundary demarcation.
It is a structured rehabilitation and restoration plan after mining.
Yes. We provide compliance documentation support.
Yes. We have extensive experience in minor mineral sector.

4. MONITORING & LAB SERVICES

Air, water, soil, noise, wastewater, stack emissions, sludge, and hazardous waste.
Yes. Monitoring is supported by Super Tech Analytical Lab (NABL certified).
Measurement of pollutants in surrounding air.
Testing emissions from industrial chimneys.
Yes. We test surface, groundwater, and treated wastewater.
A structured evaluation of compliance with environmental regulations.
Frequency depends on regulatory conditions.
Yes. We prepare detailed monitoring reports.
Yes. We conduct baseline studies as per EIA guidelines.
Yes. We analyze sludge and hazardous waste samples.

5. WATER & CGWA SERVICES

Approval required for groundwater extraction.
Industries extracting groundwater beyond prescribed limits.
Yes. We evaluate water usage and efficiency.
Water balance, hydrogeological study, recharge plan.
Plan to compensate extracted groundwater.
Yes.
Yes.
Yes.
Yes.
Yes.